Reference Projects

Boiler House Dob

Boiler House Dob
For the heating supply needs of the prison facility Dob pri Mirni, a biomass (wood chips) boiler house was built. The project was a collaboration between the The Prison Administration of the Republic of Slovenia under the wing of Ministry of justice and the local community with the aim of a local self-supply of heat energy and reductions in the cost of thermal energy.
Images: NOM BIRO

Architecture office

Architectural design, consulting and supervision Jože Cugelj

Services

  • main water supply connection
  • indoor sanitary installation
  • boiler equipment 2,5 MW
  • district heating to existing users

Specialty of the project

  • use of renewable energy source – wood chips
  • a significant reduction in heating costs

Year of the project

2013

Project status

completed in 2014